Project Repsol Piper Bravo
For the last 8 years GGI has provided a Controls Engineer in the position of Turbine Specialist for Repsol Sinopec Resources UK on the Piper Bravo platform. This position is on a 3 weeks on and 3 weeks off basis.
The responsibilties of this role include:
The care of the four John Brown Engineering Frame 5 Gas Turbine power generating sets which have Speedtronic™ MK IV control system.
Co-Ordinating all planned maintenance from work permit creation, work order generating, parts procurement & liasing with third party vendors.
Troubleshooting of any unplanned breakdowns and returning Gas Turbines to service to ensure platform production is not afffected.
Project Magnus
For the last 2 years GGI has provided a Controls Engineer and Mechanical Technical Advisor in the position of Turbine Specialist for Enquest UK on the Magnus platform. These positions are on a 3 weeks on and 3 weeks off basis providing permanent platform cover.
The responsibilities of this role include:
The care of the three John Brown Engineering Frame 5 Gas Turbine power generating sets which have Speedtronic™ MK II control system.
Co-ordinating all planned maintenance from work permit creation, work order generating, parts procurement & liaising with third party vendors.
Troubleshooting of any unplanned breakdowns and returning Gas Turbines to service to ensure platform production is not affected.
North Sea Oil Platform Turbine Control Retrofits
GGI provided project management, installation and commissioning services for 2x Frame 5 controls retrofit project on a North Sea Oil platform. The 2 original MKI Speedtronic™ Panels were replaced with Allen Bradley Control systems. The Generator Control, Protection and MCC were also replaced along with a total GT rewire and conduit replacement.
GGI also provided project management, installation, panel refurbishment, factory panel test, training and commissioning services for the 2x Frame 5 on the sister platform The original 2 MKI Speedtronic™ panels were replaced with 2x Refurbished MKV Speedtronic™ Panels and VT Scada HMI’s. An Instrument upgrade which included replacing pressure switches with transmitters was also performed.
Shell Project
GGI has supported Shell St Fergus on all their Frame 5002 Turbine outages since GGI’s conception in 2013.
Duties have included:
This is in conjunction with a guaranteed 24 hours; 365 day dedicated telephone line and guaranteed Engineer on site within 12 hours of call. Regular monthly Turbine Heath Checks which help maintain against unforeseen downtime of the Gas Turbines.